Tagline

Level of Development

home  »  Services  »  Level of Development

Level of Development (LOD) for BIM

Usage of BIM foresees primary visualization of a building prior to its actual physical construction and supports in clash detection at the preliminary stage, detecting the precise location of discrepancies thereby reducing delays, errors and subsequent wastage.

It aids architects to scrutinize several building factors like spatial relationships, Building geometry, Lighting analysis, Building properties and Geographic information. BIM facilitates subcontractors to collaborate effectively through conflict or ‘clash detection’ among architectural, structural and MEP components and develop an integrated 3D model.

We deliver LOD for different levels as stated by AIA:

Our BIM experts adapt to Level of Development (LOD - 100 to 500) with explicit state of clarity and dependability. These advancement models are reason worked for different phases of configuration, design, 3D visualization, construction-caliber quantities, scheduling, estimations, on-site production control and fabrication.


Related Case Studies

SERVICES

3D BIM 4D BIM 5D BIM BIM Coordination Clash Detection Revit Families Scan to BIM BIM Lean Construction Level of Development

SOLUTIONS

Architectural BIM Structural BIM MEP BIM
ASK OUR BIM EXPERT

We Deliver a Deeper Level of BIM Solutions for a Higher Level of Building Design & Construction Firm.

Markets We Serve